Eversley Road, Sketty, Swansea

  

Find out how the project went…

GET IN TOUCH

About The Project

Project:  Eversley Road, Sketty, Swansea SA2 0UH 

Our client: Easyliving  

End client: Coastal housing  

 

 

  • Sketty development creating 13 new apartments on the site, which will continue to offer parking spaces for local people after construction completes. 

 

  • specification that included the use of Bauder’s BauderFLEX waterproofing system incorporating the XF301 lightweight green roofing system.  

 

  • This green roofing system includes an integrated water retention and filter layer. It comprises Sedum on 20 mm of extensive substrate and incorporates a multifunctional water retention and filter layer. 

 

  • Extensive green roofs are designed to be low maintenance, lightweight systems with no general access. 

 

System specification: 

Second floor  

Field Area  

18mm timber deck 

Self-adhesive primer  

KSD Mica Air and Vapour Control Layer 

Tapered insulation scheme  

Sprint Duo Underlayer 

AP2 Capping Sheet 

Detail  

KSD Mica Air and Vapour Control Layer 

Sprint Duo Underlayer 

K4E Capping Sheet 

 

Third floor  

18mm timber deck 

Self-adhesive primer  

KSD Mica Air and Vapour Control Layer 

140mm FATE insulation 

Sprint Duo Underlayer 

AP2 Capping Sheet 

Detail  

KSD Mica Air and Vapour Control Layer 

Sprint Duo Underlayer 

K4E Capping Sheet 

Rhiwbina Primary School

About The Project

The roofing works completed at Rhiwbina Primary School was completed for Cardiff County Council, as a part of our Roofing Framework Agreement. The work included the renewal of the pitched & flat roofs (pictured above). The existing Cambrian slate pitched roof was completely stripped, and a new Britmet 2000 system was installed on new felt and new treated batten, While the existing flat roof areas were overlaid using Alumasc’s Caltech QC liquid waterproofing system.

The roofing work at Rhiwbina Primary school was carried out throughout the winter months whilst the school remained live and in use, while this was challenging our onsite Site Manager liaised with the client daily to ensure smooth running of the site, resolving any issues or queries that arose. We were allocated a section of the rear playground to set up a compound, the compound was fully fenced off with Heras fencing to encapsulate the Welfare, Storage, and other materials.

The efficient communication was vital as the weather was difficult and the programme was tight. Work hours were adapted subject to school opening times and road closures, similarly any deliveries to site were scheduled before or after school hours due to the restricted access and live school.